The bathroom is a room with particular requirements: high humidity, humidity differences. That’s why making fixes in the restroom, you should clearly plan the whole working process, to think about the sequence of measures to be achieved. In the following guide, you will discover where to begin the fix in the bathroom and what sorts of work should be performed with your own hands. Step-by-step instructions for bathroom repair

Phase 1: Establishing a strategy and deciding upon a layout solution.

Fix in the bathroom can be of two types:

  • Unplanned, spontaneous, arising from the will of unexpected conditions. By way of instance, in the event of an pipe burst, flooding with neighbors.
  • Planned, that is either cosmetic or capital. It requires planning, serious fiscal investment and time.

Begin repairs in the bathroom is to ascertain the design, inside. Think through the last detail, what will be the room, choose a colour. Pastel colors are traditional, in addition to a mixture of blue and blue, black or peach with beige.

Begin repairs at the bathroom is to ascertain the design, interior layout. Consider detail, what’s going to be the room, choose a colour. Pastel colors are deemed traditional, as well as a mixture of colours.

The next point is the selection of facing substance. Usually, finishing at the bathroom is performed with vinyl, porcelain tiles, mosaicand plastic panels. Check the plumbing, vsyakuhnya.ru whether it ought to be mended. If necessary, choose the right option. Proceed to the measuring function: step all sides, calculate the area of the area. Based on these data, we indicate the location of the plumbing fittings.

Step 2: the selection of sanitary fittings and material for finishing.

It is necessary to realize that the purchase of sanitary ware precedes the planning stage, and not vice versa. This means that first we develop a new design project, create a plan, then go to the store. Yet another point – you need to specify the size of your favorite plumbing fittings and inspect the plan, whether it fits.

It’s necessary to recognize that the cost of plumbing fixtures is preceded by a preparation phase, and not vice versa. This usually means that first we develop a new design project, make a plan, and then go to the store. Another one

In terms of materials for finishing, it’s preferable to purchase them instantly for the whole repair cycle, in order that then you will not be diverted if something was missing. Remember about preparing the necessary tools.

Step 3: dismantling plumbing and tiling.

After all the preliminary work has been completed, proceed to the Start of the task process:

  • Remove the sink and bathtub from the area, even though they will not be replaced with new ones. This way, you can keep them intact and clean.
  • Eliminate the old tile, cleaning after it all surfaces: ceiling, walls, floor.
  • Remove old paint from the walls, even if they had been previously painted, as the glue alternative or a new layer of paint won’t adhere to the surface.

Step 4: replacement of communications: plumbing, electrical wiring.

Very often in an old home, you should carefully inspect and replace not just the pipes which are in the bathroom itself, but also the main riser, and on occasion the interfloor plumbing. What’s it worth doing so? Old pipes anytime may give a leak, and then the new repair will be emptied, it will call for additional investment to eliminate flaws.